Peer Review Status:UNDER REVIEW

27 Apr 2020Submitted to Engineering Reports
28 Apr 2020Assigned to Editor
28 Apr 2020Submission Checks Completed
30 Apr 2020Reviewer(s) Assigned

loading page

A Complex Garment Assembly Line Balancing Using Simulation-based Optimization